Flooring Install Part 12 | Livestream Shop Cam
255 views
May 2, 2025
Have questions? Ask in the Chat! Join me on this livestream as we seal floor and get ready for epoxy! Whenever you’re ready, there are 2 ways we can help you: 1. If you need a vetted parts list, download our → FREE DIY Van Build Cheatsheet to help you save time and money on Van Parts and Gear: CLICK HERE: https://van-builder-hq.ck.page/846c83ab54 2. If you want to get Done-For-You Van Build help, book a → FREE Consultation with my Calendly Link: CLICK HERE: https://calendly.com/odysseycustomvans/intro-call?month=2023-07
View Video Transcript
0:01
[Music]
0:21
thank you
0:23
okay guys we are live
0:26
so let me double check that we have the
0:28
sound once again
0:31
should be good to go
0:43
all right
0:47
I think we're good thanks for letting me
0:49
know about the sound we should be all
0:50
set and good to go here so let me go
0:54
back and talk about what I got cut off
0:56
on because I was waiting for the the
0:58
sound to get back in
1:06
all right so what we're working on here
1:07
is we have our
1:10
uh three pieces of flooring in so this
1:13
is all dried and in from last night
1:16
uh one question I wanted to answer from
1:19
a viewer had to do with why we were
1:21
covering up the screw holes with epoxy
1:24
in case we needed to access them again
1:26
in the future
1:27
so we don't need to access them again
1:30
ever when we do a Florence install it is
1:33
permanent this will be here forever
1:35
unless customer wants to rip it out and
1:37
do something different
1:39
so the adhesives that we use like the
1:42
Marine adhesive to attach the foam to
1:45
the floor
1:46
the foam to the wood and then next we're
1:49
going to be attaching
1:52
with a special epoxy a two-part epoxy
1:55
from lawn seal so that's the company
1:57
right here that I was showing you guys
2:00
just a second ago
2:02
this company
2:07
so these products
2:13
specifically this one this is the one
2:15
that we're using today
2:18
so we're installing this product
2:21
and no affiliation with the company just
2:23
we really like the product that is going
2:26
in the floor so what we're doing by
2:28
covering up the screw heads and putting
2:30
epoxy on these transition gaps is one we
2:34
want to make sure that we have a nice
2:36
smooth transition and we don't have a
2:38
like a bump in the material
2:40
because that little bump will make like
2:41
a little air gap because the floor needs
2:45
to be super flat
2:46
we'll be using a trowel to trowel on the
2:48
epoxy for the epoxy to adhere to bare
2:52
wood well we're going to need to use a
2:54
product right here which is called a
2:56
bonding primer
2:58
so this right here uh it's a waterborne
3:01
bonding primer and it's a urethane
3:04
acrylic and so this is specifically
3:07
made to take wood or there's other
3:11
products on here
3:12
for example
3:15
let's see here
3:25
interior exterior surfaces including PVC
3:27
vinyl plastic glass tile glaze block
3:29
glossy paints
3:31
uh
3:33
powder coating sodium fiberglass
3:35
galvanized materials
3:37
ideal for plaster drywall and wood
3:39
substrates
3:40
and Commercial institutional and
3:42
residential applications
3:46
oh
3:47
so we put this on the floor that allows
3:50
our epoxy to hear very well
3:52
and once we do that we will take our
3:55
floor which is that material that I just
3:58
showed you
3:59
so I took the top of it off so you guys
4:01
could see
4:02
see it a little bit better
4:05
here's our material
4:07
and we tried the epoxy on because it's
4:09
almost like like almost like a carpet
4:11
it's a paper
4:12
backed material
4:14
and that allows it to absorb onto the
4:19
uh material itself
4:21
uh it's almost like a fabric I guess you
4:24
would say
4:27
but that holds that holds the floor down
4:30
this floor is used in all kinds of
4:32
environments it's used in
4:35
specifically the Marine industry so when
4:38
we go to look up this product online
4:40
you'll see we go to lawn Seal's website
4:44
and if we scroll down at the bottom
4:48
well actually we'll go to product let's
4:49
see here
4:51
I want to go to
4:57
we'll go to Marine
5:00
click learn more
5:06
and they've got music playing
5:08
anyway you click on marine and you'll go
5:10
to
5:11
find the product and the product we're
5:13
using is long coin one
5:16
this product is used in all kinds of
5:18
different scenarios so this is on a boat
5:22
have it like some engineering facility
5:24
right here
5:26
trains
5:28
science lab
5:31
actually I think that's a photo lab
5:34
um
5:35
and then this one is just like you know
5:38
if you want to get more designer
5:39
different colors
5:42
and it's made for extremely high traffic
5:44
areas
5:46
commercial use
5:48
as well as
5:51
these industries so we have
5:54
zoom in here
5:56
it's a corporate Fitness retail exterior
5:59
decking Marine specialty Vehicles so
6:02
it's extremely resilient
6:06
resilience and high traffic Interiors
6:08
for decades
6:12
yeah so that's what we're using this
6:14
product
6:15
so we're just prepping our floor this
6:17
final pretty much the final step of our
6:20
flooring install
6:22
so once we paint this on and we let it
6:23
dry
6:25
we're going to unroll the lawn sill and
6:27
then we're going to put it down
6:30
we're going to since we have these uh
6:32
covers down here at the end
6:34
so
6:36
these uh kind of
6:40
decorative trim pieces but they're also
6:42
made to take abuse
6:44
so it's powder coated Steel
6:48
and it's going to cap off our end
6:51
and we purchased this from AVC rig
6:55
there's no affiliation there this is
6:57
just a good product
6:59
so this is going to go right here on the
7:01
back of the cap
7:03
when we get finished with everything
7:07
and so once when we do get finished
7:11
what we're going to do
7:12
actually let me back up
7:15
since this cover is going to go here so
7:18
let me take a marker
7:22
so we'll just mark this
7:25
okay
7:27
so when I take this off you'll see that
7:29
there's that line
7:31
that line is going to be hidden
7:35
and then what we're going to do is we
7:36
take the center
7:38
line the center line of the van
7:41
which is let's just say it's right about
7:42
right there
7:45
and we're going to unroll the lawn sill
7:47
flooring
7:48
and roll it all the way back it's
7:49
actually going to hang off a little bit
7:51
we got 12 feet and we only need
7:55
I think 11
7:58
actually I will confirm that
8:01
so you guys know exactly how long this
8:03
floor is
8:06
it's the point of what we do here at the
8:08
channel
8:19
let's see if I can find my my good tape
8:22
measure everybody has a good tape
8:23
measure right
8:33
Stanley makes a tape measure called fat
8:35
Max
8:36
it's the only tape measure to get
8:42
because it extends all the way out nice
8:44
and easy
8:46
let's see if we got our
8:48
people back here on the channel
8:57
all right
9:06
so our floor is 11
9:08
feet
9:10
six and a quarter inches at its longest
9:13
point
9:20
at its widest point
9:23
all right I'm guessing 63. let's see how
9:27
good I am with my memory
9:31
up 67 and a half
9:38
actually
9:41
let's get super technical here
9:44
this is a van from the adventure wagon
9:46
frame to frame is 69 the floor is 68. so
9:50
we come back a half inch on each side
10:01
all right
10:09
so let's put this down
10:11
dries we trowel out our lawn still
10:15
because the trowel is important because
10:16
there's a specific
10:19
specified thickness of all the ridges
10:21
kind of like doing tile
10:23
so you need to specifically have a
10:24
certain height so that when you roll the
10:27
lawn seal on
10:28
you don't have these uh like bubbles
10:31
within the material as you can imagine
10:34
if you put epoxy down it kind of runs
10:37
and moves so you don't want a big glob
10:40
of it in one area where you heavily
10:42
trailed and then minimally trout in
10:44
another area
10:45
the final step is you need to rent a 100
10:49
pound roller from
10:52
uh like a plate like a rental company
10:54
Sunbelt Rentals I think Home Depot also
10:57
does it but you rent that roller
11:00
and then you need to make sure before
11:01
you use the roller on your new floor
11:04
what I do is I take a sanding pad and I
11:07
sand all the steel roller Wheels I sand
11:09
them down I get any of the junk from
11:11
some other contractors or something like
11:13
that I get them super clean then I clean
11:16
them up with denatured alcohol
11:18
that way I know the rollers are really
11:19
nice and clean
11:21
and then I roll my floor out because you
11:24
don't want any like metal Burrs or
11:26
anything from some construction site
11:27
that you've got on there also you want
11:29
to
11:30
sand down any uh
11:33
sharp edges so you don't want it cutting
11:36
into your floor since it is a rental
11:38
piece of item
11:42
I guess technically you could also put
11:45
tape around it you could wrap tape
11:46
around it I might I might do that but
11:48
really what you're what we need is we
11:50
need the weight
11:51
to really get that contact patch nice
11:54
and put down
11:56
and it's very quick so once we roll the
11:59
thing out once we roll it down we
12:01
haven't put our epoxy yet but we roll it
12:03
out we're going to put a screw here
12:07
okay so we're going to line up our floor
12:09
we'll put a screw at the front just like
12:12
this and then we'll put a screw at the
12:13
back and we put we do that screw method
12:16
I forgot who I learned it from
12:18
so that you can put half of the material
12:20
on the right and half on the left and
12:22
then you can fold one half over
12:24
work one side quickly
12:27
lay it down
12:28
put it down peel the other side up
12:31
work that side really quick
12:34
and then put it back down it's a really
12:35
good method to manage your time
12:38
because you have seven and a half
12:39
minutes on each side
12:42
so you take the two part you pour it in
12:44
a bucket it needs to
12:46
uh set for about 15 minutes for the
12:49
reaction to start happening and then you
12:51
have 15 minutes after that to actually
12:53
put it down
12:54
so things happen really quick you gotta
12:57
be ready
12:59
so
13:01
that's we're going to get ready for
13:03
um
13:04
and then the other thing that we're
13:06
going to do is when we roll this out
13:08
we're going to do a dry fit before this
13:11
goes down
13:12
and I know this order is backwards but
13:14
don't worry we're going to put it in
13:16
order in a video
13:18
but you need to roll it out you need to
13:20
pre-cut your sides uh the holes in the
13:25
floor
13:26
anything that's going to get in your way
13:28
gluing it down stuff that you can trim
13:31
and remove now
13:33
uh is better than doing it when you're
13:36
in the moment
13:37
because if you can imagine if we're
13:38
coming on this Edge and we get caught up
13:40
on this thing we can't get it and it
13:42
starts messing us up
13:44
you can't get the time back once you
13:46
start the epoxy process so
13:49
you don't need to get caught up on
13:51
trying to fix something or getting
13:53
something unstuck because
13:57
clock is ticking
13:59
and we're going to do the epoxy live
14:03
so
14:04
it'll be enjoyable for you stressful for
14:07
me so
14:08
uh stay tuned for that I don't think
14:11
we'll get it done today today is the
14:12
epoxy and letting this dry overnight and
14:15
then tomorrow we'll
14:17
um actually tomorrow
14:20
I don't think I'm going to be here
14:24
maybe we can knock it out in the morning
14:25
we'll see
14:28
um this takes
14:33
let's see here
14:41
yeah 24 hours
14:43
you can it's tack free and 30 recoat
14:47
three to four hours top coat with second
14:49
component paint
14:51
so technically that would be our epoxy
14:53
in 24 hours
15:01
okay
15:03
all right guys well we are going to uh
15:06
we're going to sign off we are going to
15:08
unless you guys have questions we got
15:10
four people actually watching right now
15:12
so
15:14
do you guys have any questions on the
15:15
floor before I uh
15:18
we're going to come back another live
15:19
stream I'm just gonna I need to let the
15:21
epoxy dry for an hour
15:23
I'm gonna grab some food and I'll be
15:25
back but
15:27
um yeah I got a couple minutes here to
15:30
answer any questions if you guys have
15:31
them
15:33
so let me know
15:37
um while you're thinking of questions
15:39
let's see what else we're going to talk
15:40
about
15:44
the most thing the thing I'm most
15:45
excited about the floor getting in is I
15:48
keep saying things that happen quickly
15:49
they really do because we don't need to
15:51
modify the kitchen galleys we've already
15:53
grinded modified or isotherm Cruise 130
15:56
fridge has already been
15:58
modified cut and re-powder coated so
16:02
those those things are just going to pop
16:03
in
16:04
our battery system is sitting over there
16:06
on our bench it's ready to go it just
16:08
needs to be disassembled partially and
16:11
then reassembled back over here but it's
16:13
going to take us getting the floor in
16:15
because it's going to it needs to sit
16:17
down
16:18
so right here on this Edge
16:22
you see the move with the wood that's
16:24
removed the wood that stays is the
16:26
perimeter to hold
16:28
uh
16:30
the system down
16:31
and there's a lot of weight
16:35
um
16:37
but yeah
16:40
okay looks like I don't have any
16:42
questions so stay tuned for the next
16:44
episode we will be installing our
16:46
waterborne bonding primer
16:49
and that will get us in preparation for
16:52
our floor and bring your questions to
16:55
the live stream make sure you guys are
16:57
subscribed like this video If you
16:59
enjoyed it
17:00
and uh yeah we will see you guys in the
17:03
next stream coming up here shortly
17:11
foreign
#Construction & Maintenance
#Flooring
#Home Improvement